Bear Lakes Middle School

School Info
Maps are unavailable at this time.
Facilities

Bleachers
• Interior Bleachers / Gym Area Replacement
Interior Bleachers/Gym Area Replacement - Work scheduled to be completed during the 2017 - 2018 school year.
Building Envelope
• Exterior Doors
• Exterior Finishes (i.e., Stucco)
• Gutters & Downspouts
• Water Intrusion/Waterproof Application
• Windows
Building Envelope - All work scheduled to be completed during the 2018 - 2019 school year.
Compliance
• ADA Violations
• CSIR Violations
• Signage
Compliance - All work scheduled to be completed during the 2018 - 2019 school year.
Custodial Equipment
• Custodial Equipment-Replacement
Custodial Equipment Replacement - Work completed.
Fencing
• Perimeter Fencing
Perimeter Fencing - Work scheduled to be completed during the 2018 - 2019 school year.
Fire/Life/Safety
• Electrical-Switchgear
• Emergency Generator
• Fire Alarm/Panel Upgrade
• Fire Alarm/Smoke & Duct Detector Replacement
• Stage Curtains
Stage Curtains - All work scheduled to be completed during the 2017 - 2018 school year.

Fire/Life/Safety - All remaining work scheduled to be completed during the 2018 - 2019 school year.
Furniture & Equipment
• Classroom Furniture
Classroom Furniture - Work scheduled to be completed during the 2018 - 2019 school year.
HVAC
• Air Handlers
• Chilled Water Piping
• Chiller Replacement
• EMS Controls
• Exhaust Fans
• Sheet Metal-Ductwork/Outside Air Dampers
Chiller Replacement - Work completed.

HVAC - All remaining work scheduled to be completed during the 2018 - 2019 school year.
Intercom/Sound Systems
• Intercom Replacement
• Sound Systems
Intercom/Sound Systems - All work scheduled to be completed during the 2018 - 2019 school year.
Interior Repairs & Improvements
• Acoustical Ceiling
• Flooring Vinyl
• Gym Floor-Refinishing
• Interior Finishes/Paint/Casework
• Interior Finishes/Paint/Casework (Bldg 2 window blinds)
• Interior Finishes/Paint/Casework (Main office store front windows)
• Lockers
Gym Floor - Refinishing - Work scheduled to be completed during the 2017-2018 school year.

Interior Repairs & Improvements - All remaining work scheduled to be completed during the 2018 - 2019 school year.
Lighting
• Exterior Wall Lighting
• Parking Lot Lighting
Lighting - All work scheduled to be completed during the 2018 - 2019 school year.
Parking Lot
• Parking Lot Paving/Striping
Parking Lot - Work completed. 
Playfields & Exterior Repairs & Improvements
• Irrigation
• Marquee Signs/Repair Electronic Marquee
• Play Courts
• Running Tracks
• Score Boards / Gym Area Replacement
Play Courts - Work completed.
Running Tracks - Work completed.

Play fields & Exterior Repairs & Improvements - All remaining work scheduled to be completed during the 2018 - 2019 school year.
Plumbing
• Boilers - Gym Replacement
• Boilers - Kitchen Replacement (3)
• Plumbing-Bathroom Replacement
• Plumbing-Water & Sewer Lines
• Plumbing-Water Fountains
Plumbing - All work scheduled to be completed during the 2018 - 2019 school year.
Roofs
• Roof Repairs
• Structural Covered Walkways
Roof Repairs - Work completed. 

Roofs - All remaining work scheduled to be completed during the 2018 - 2019 school year.
Technology

Classroom Technology