E-Agenda: Paperless Meeting System
Back to Agendaspacer graphic
 

Special Meeting/Workshop - No Division Assigned

Title: CP3-Phase 2 for Design/Build- Crystal Lakes ES and Sandpiper Shores ES

Recommendation:
 I recommend the School Board approve the Phase 2 cost for design and construction with Suffolk Construction Company in the amount not to exceed $4,186,472 for Crystal Lakes ES, Project No. 2121-9405 and $4,128,201 for Sandpiper Shores ES, Project No. 1961-9405 and authorize the Superintendent and Board Chairman to sign all required documents.

Description:

Phase 2 design and construction of HVAC and life safety systems replacement in accordance with the permitted design documents and Board adopted Five-Year Capital Plan.

 
Approved budget for design and construction:
Crystal Lakes ES-$12,156,917
Sandpiper Shores ES-$12,771,073
Construction Type:N/A
No. of Stories:N/A
Construction Type: HVAC and life safety systems replacement to existing facility

Gross Square Feet: 85,839 (Crystal Lakes ES); 85,510 (Sandpiper Shores ES)  

Cost Per Square Foot: $48.77 (Crystal Lakes ES); $48.28 (Sandpiper Shores ES)

Student Stations: N/A (Crystal Lakes), N/A (Sandpiper Shores ES)

Cost Per Student Station: N/A (Crystal Lakes ES); N/A (Sandpiper Shores ES)

Phase 1 Design and Construction: Crystal Lakes ES-$6,542,504 Sandpiper Shores ES-$7,818,134
Phase 2 Design and Construction: Crystal Lakes ES-$4,186,472 Sandpiper Shores-$4,128,201
Total Phase 1 & Phase 2: Crystal Lakes ES-$10,728,976 Sandpiper Shores ES- $ 11,946,336

Financial Impact:
The financial impact is $4,186,472 for Crystal Lakes ES and $4,128,201 for Sandpiper Shores ES. The source of funds is the corresponding Capital Projects Budget. The District will provide Builder's Risk insurance for this phase of the project at a total cost of $30,980 for Crystal Lake ES and $30,550 for Sandpiper Shores ES.

For Additional Information, contact:

Joseph M. Moore (moorej@palmbeach.k12.fl.us)

Joseph M. Sanches

Attachments (list):
beneficialinterest.suffolk.pdf
ppe.suffolkconstruction.pdf
data panel.Crystal Lakes.pdf
data panel.Sandpiper Shores.pdf
siteplan.crystallakes.pdf
siteplan.sandpipershores.pdf

spacer graphic