This contract enables the School District of Palm Beach County to address the presenting issues for the over-aged middle school student who has been retained multiple times (more than once).
The goal of this program is to accelerate student progression to the 9th Grade for those students who are age appropriate for high school but are attending middle schools due to multiple retentions.
The program will provide accelerated academic instruction through computer-assisted instruction, to middle school students who are over-aged for their grade level; and, who have been retained at least one time in grades Kindergarten through Eighth, and, who are Level 1 FCAT students.
Students will attend one four (4) hour session of electronic instruction in the core academic subject areas
(English, Mathematics, Social Studies and Science), utilizing software curriculum provided by Whitehat Management. The teachers will be hired by Whitehat Management to deliver the instruction in the classes. Transportation, food service and discipline will be administered by the school. Electives and lunch will be provided by the school. The School District will also be responsible for capital improvement, including technology equipment and other technology requirements associated with this program at the two school locations. Capital improvements will remain at the school with or without the future use of an outside contractor for this academic instruction.
In order to deliver the program effectively, the students' day will be extended and opportunity for an extended year will be offered to those students who require additional time to demonstrate mastery of the middle school standards.
Two area middle schools, John F. Kennedy Middle School and Lake Shore Middle School, have been selected to participate in this program. These schools were identified as schools with the highest percentage of students who meet the criteria of over-age, multiple retentions and performance of Level 1 FCAT.
This program will begin second semester SY2006 and continue through the end of SY2006 (June 2006). Students participating in the program will do so voluntarily. Parents will acknowledge their student's participation in the program.
Success of the program will be determined by the achievement of the objectives outlined in the addendum to the existing contract with Whitehat Management.