Title: PM10 Project Modifications for Limestone Creek Recommendation:
I recommend the School Board approve Project Modifications in the amount of $84,291.00 for Limestone Creek Elementary School, Classroom Addition Project, and authorize the Chairman and Superintendent to execute all related contract documents.
Description:
Limestone Creek Elementary School – Classroom Addition Project #2031-8377
This Project Modification contains the following items:
Item #1
- Additional Architectural Services in the amount of $20,216.00.
- Description: Architectural services for design and engineering for added scope to additions and remodeling to include Brick Remediation.
- Cause: School District Requested.
- Justification: The scope of work has been adjusted to include the installation of brick ties on existing bricks in lieu of the removal and replacement of existing bricks on the entire campus. Also included is the replacement of sealants and roof parapet repairs. This is one of the Schwab and Twitty designed schools that have brick faults such as; brick tie failure, missing brick ties, missing expansion joints and moisture flashing problems.
Item #2
- Additional Architectural Services in the amount of $64,075.00
- Description: Architectural services for the design and engineering for the added scope to the additions and Brick Remediation to include the roof replacement.
- Cause: School District Requested
- Justification: The scope of the additions and Brick Remediation work has been modified to include the replacement of the failing existing single-ply roofs on Buildings #1, #2, #3 and #4.
Financial Impact:
The financial impact to the Project’s Budget is $84,291.00.
The source of funds is the Restricted Reserve.
For Additional Information, contact:
Joseph M. Moore (moorej@palmbeach.k12.fl.us) Joseph M. Sanches
Attachments (list):
PM10 Site Plan.pdf
PM10 Data Panel.pdf
PM10 Backup.pdf
|